COMPARISON OF PPV PREDICTION BETWEEN EMPIRIC METHODS AND ARTIFICIAL NEURAL NETWORK (ANN) FOR BLASTING OPERATIONS IN PARINGIN PIT, PT ADARO INDONESIA
PT Bukit Makmur Mandiri Utama (BUMA) is one of the largest coal mining contractor in Indonesia and have many sector with different mining business permit (IUP) holders, which are located in Kideco, SDJ, Lati, Binungan and Paringin. One of leading companies in coal industry that are business partn...
Saved in:
Main Author: | Fitrabuana, Asril |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61242 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INTERPRETATION OF POTENTIALLY ACID FORMING (PAF) AND NON-ACID FORMING (NAF) DISTRIBUTION USING BLAST HOLE CUTTING SAMPLES DATA IN PIT PARINGIN AREAS PT. ADARO INDONESIA SOUTH KALIMANTAN
by: NORFAEDA (NIM : 22115305), RAHMA -
IMPROVEMENT OF PERFORMANCE MANAGEMENT SYSTEM USING THE BALANCED SCORECARD AT BUMA SITE ADARO PARINGIN
by: Farhan Izharuddin, Muhammad -
AN ASSESSMENT TO THE POST MINING SURFACE WATER MANAGEMENT ON THE PART OF THE INACTIVE PARINGIN AREA IN PT. ADARO INDONESIA
by: PRADIPTA (NIM : 22108007), SENA -
STUDY OF DOZER NEEDS FOR MATERIAL DOZING AT PIT PARINGIN WASTE DUMP
by: AGUSTO - Nim: 12114023 , FERNANDO -
WOOD PELLET CHARACTERISTICS OF FIVE WOOD ENERGY SPECIES GROWN IN POST MINING RECLAMATION AREA OF PT ADARO INDONESIA AT PARINGIN SITE, SOUTH KALIMANTAN
by: Bulkiah, Triah