INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Disco...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62106 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:62106 |
---|---|
spelling |
id-itb.:621062021-11-29T10:49:49ZINVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO Siregar, Abdollah Manajemen umum Indonesia Theses Capital Budgeting, Investment Evaluation, Sensitivity Analysis, Monte Carlo Simulation, uncertainty INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62106 Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback Period (PBP). From the evaluation, it was obtained rental fee/month for compressor USD 456.001/month, NPV of 817.333, an IRR of 6,30% greater than the WACC of 4,21%, while the DPI of 1.11 and PBP of 1.78 years was faster than the duration of the 2 (two) year contract. Monte Carlo simulation used 1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this project is 0,48% meanwhile probability NPV>0 is 99,52%. In the sensitivity analysis, it is found that the increase in the cost of capital and the duration of the agreement are the most sensitive to project feasibility. From the results of the above calculations, it can be concluded that Gas Compressor Investment for PLTG 4 x 25 MW Gas is Eligible to be accepted. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Siregar, Abdollah INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO |
description |
Investment evaluation is a crucial part before investment decision in order to measure
will the project generate profit for the company. There are four Capital Budgeting
technique use to measure this investment evaluation in this project Net Present Value
(NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback
Period (PBP).
From the evaluation, it was obtained rental fee/month for compressor USD
456.001/month, NPV of 817.333, an IRR of 6,30% greater than the WACC of 4,21%,
while the DPI of 1.11 and PBP of 1.78 years was faster than the duration of the 2 (two)
year contract. Monte Carlo simulation used 1.000 times to calculate Probability
NPV<0 with result Probability NPV<0 in this project is 0,48% meanwhile probability
NPV>0 is 99,52%.
In the sensitivity analysis, it is found that the increase in the cost of capital and the
duration of the agreement are the most sensitive to project feasibility.
From the results of the above calculations, it can be concluded that Gas Compressor
Investment for PLTG 4 x 25 MW Gas is Eligible to be accepted. |
format |
Theses |
author |
Siregar, Abdollah |
author_facet |
Siregar, Abdollah |
author_sort |
Siregar, Abdollah |
title |
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO |
title_short |
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO |
title_full |
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO |
title_fullStr |
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO |
title_full_unstemmed |
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO |
title_sort |
investment evaluation in pt pelayanan energi batam, case study : gas compressor investment pltg 4 x 25 mw maleo-gorontalo |
url |
https://digilib.itb.ac.id/gdl/view/62106 |
_version_ |
1822931848376877056 |