INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO

Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Disco...

Full description

Saved in:
Bibliographic Details
Main Author: Siregar, Abdollah
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62106
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:62106
spelling id-itb.:621062021-11-29T10:49:49ZINVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO Siregar, Abdollah Manajemen umum Indonesia Theses Capital Budgeting, Investment Evaluation, Sensitivity Analysis, Monte Carlo Simulation, uncertainty INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62106 Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback Period (PBP). From the evaluation, it was obtained rental fee/month for compressor USD 456.001/month, NPV of 817.333, an IRR of 6,30% greater than the WACC of 4,21%, while the DPI of 1.11 and PBP of 1.78 years was faster than the duration of the 2 (two) year contract. Monte Carlo simulation used 1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this project is 0,48% meanwhile probability NPV>0 is 99,52%. In the sensitivity analysis, it is found that the increase in the cost of capital and the duration of the agreement are the most sensitive to project feasibility. From the results of the above calculations, it can be concluded that Gas Compressor Investment for PLTG 4 x 25 MW Gas is Eligible to be accepted. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Siregar, Abdollah
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
description Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback Period (PBP). From the evaluation, it was obtained rental fee/month for compressor USD 456.001/month, NPV of 817.333, an IRR of 6,30% greater than the WACC of 4,21%, while the DPI of 1.11 and PBP of 1.78 years was faster than the duration of the 2 (two) year contract. Monte Carlo simulation used 1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this project is 0,48% meanwhile probability NPV>0 is 99,52%. In the sensitivity analysis, it is found that the increase in the cost of capital and the duration of the agreement are the most sensitive to project feasibility. From the results of the above calculations, it can be concluded that Gas Compressor Investment for PLTG 4 x 25 MW Gas is Eligible to be accepted.
format Theses
author Siregar, Abdollah
author_facet Siregar, Abdollah
author_sort Siregar, Abdollah
title INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
title_short INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
title_full INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
title_fullStr INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
title_full_unstemmed INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
title_sort investment evaluation in pt pelayanan energi batam, case study : gas compressor investment pltg 4 x 25 mw maleo-gorontalo
url https://digilib.itb.ac.id/gdl/view/62106
_version_ 1822931848376877056