INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Disco...
Saved in:
Main Author: | Siregar, Abdollah |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62106 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF 120 MW COMBINED CYCLE POWER PLANT (CCPP) IN BATAM (CASE STUDY OF PT PLNB)
by: Yuli Anggoro, Andryas -
BAWEAN ISLAND 5 MW POWERPLANT PROJECT INVESTMENT ANALYSIS
by: Wied Hardono, Luddie -
INVESTMENT ANALYSIS OF TOBELO POWERPLANT 30 MW PROJECT IN HALMAHERA ISLAND SYSTEM
by: Aditya Primanto, Irfan -
INVESTMENT ANALYSIS OF GAS TURBINE COMBINED CYCLE TO REDUCE THE PRODUCTION COST OF PT XYZ: CASE STUDY IPP OF PT PLN BATAM
by: Kirana -
INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
by: Sihwan Abdullah, Muhammad