INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB)
The Batam-Bintan electricity system is an integrated electric power system where power plants with distributed load centers are connected to one another on Batam Island and Bintan Island (the largest load center is in Batam city), with peak loads that have ever occurred in 2020 is 488.5 MW on Mar...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62159 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:62159 |
---|---|
spelling |
id-itb.:621592021-12-16T11:23:53ZINVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) Arief Rachman, M Indonesia Theses Gas Engine Power Plant, electricity demand growth, Build Operate and Transfer, investment analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62159 The Batam-Bintan electricity system is an integrated electric power system where power plants with distributed load centers are connected to one another on Batam Island and Bintan Island (the largest load center is in Batam city), with peak loads that have ever occurred in 2020 is 488.5 MW on March 2020. Over the last 5 (five) years (2016-2020) the electricity demand growth in Batam-Bintan is 7.83% with a Reserve Margin of 20% in 2020. With consideration of the realization of this growth and availability of reserves and issue of the end of Power Purchase Agreement (PPA) PLN Batam with PT IMP (17.4 MW) in December 2019, so to maintain the adequacy and reliability of the electricity supply, a new generator with a capacity of 30 MW is needed which is expected to be COD in 2021. The plant will act as a “peaker” so that it must have characteristics that can operate independently. flexible and has a fast lean. So, the plant that fulfill required is Gas Engine Power Plant Because at that time PLNB's financial condition was not sufficient to build a new power plant, the construction scheme was offered to IPP with the Build Operate Transfer scheme for 15 years. Methodology that uses for investment analysis are internal analysis and external analysis to define growth of electricity and resources-based view, assumption the data to define investment the project and use sensitivity analysis with monte-carlo to define probability feasible of project. The result of this investment project is feasible (NPV>0, IRR>WACC) and the probability of negative NPV only 11,8%. The proj text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The Batam-Bintan electricity system is an integrated electric power system where power plants
with distributed load centers are connected to one another on Batam Island and Bintan Island
(the largest load center is in Batam city), with peak loads that have ever occurred in 2020 is 488.5
MW on March 2020.
Over the last 5 (five) years (2016-2020) the electricity demand growth in Batam-Bintan is 7.83%
with a Reserve Margin of 20% in 2020. With consideration of the realization of this growth and
availability of reserves and issue of the end of Power Purchase Agreement (PPA) PLN Batam with
PT IMP (17.4 MW) in December 2019, so to maintain the adequacy and reliability of the
electricity supply, a new generator with a capacity of 30 MW is needed which is expected to be
COD in 2021. The plant will act as a “peaker” so that it must have characteristics that can operate
independently. flexible and has a fast lean. So, the plant that fulfill required is Gas Engine Power
Plant
Because at that time PLNB's financial condition was not sufficient to build a new power plant,
the construction scheme was offered to IPP with the Build Operate Transfer scheme for 15 years.
Methodology that uses for investment analysis are internal analysis and external analysis to
define growth of electricity and resources-based view, assumption the data to define investment
the project and use sensitivity analysis with monte-carlo to define probability feasible of project.
The result of this investment project is feasible (NPV>0, IRR>WACC) and the probability of
negative NPV only 11,8%. The proj |
format |
Theses |
author |
Arief Rachman, M |
spellingShingle |
Arief Rachman, M INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) |
author_facet |
Arief Rachman, M |
author_sort |
Arief Rachman, M |
title |
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) |
title_short |
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) |
title_full |
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) |
title_fullStr |
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) |
title_full_unstemmed |
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB) |
title_sort |
investment project analysis of 30 mw gas engine powerplant construction in batam (case study of pt. plnb) |
url |
https://digilib.itb.ac.id/gdl/view/62159 |
_version_ |
1822004024506843136 |