INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB)
The Batam-Bintan electricity system is an integrated electric power system where power plants with distributed load centers are connected to one another on Batam Island and Bintan Island (the largest load center is in Batam city), with peak loads that have ever occurred in 2020 is 488.5 MW on Mar...
Saved in:
Main Author: | Arief Rachman, M |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62159 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF 120 MW COMBINED CYCLE POWER PLANT (CCPP) IN BATAM (CASE STUDY OF PT PLNB)
by: Yuli Anggoro, Andryas -
INVESTMENT ANALYSIS OF TOBELO POWERPLANT 30 MW PROJECT IN HALMAHERA ISLAND SYSTEM
by: Aditya Primanto, Irfan -
BAWEAN ISLAND 5 MW POWERPLANT PROJECT INVESTMENT ANALYSIS
by: Wied Hardono, Luddie -
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
by: Siregar, Abdollah -
ANALYSIS OF HOT GAS FLOW DISTRIBUTION INSIDE HEAT RECOVERY STEAM GENERATOR (HRSG) AT 780 MW COMBINED CYCLE POWERPLANT
by: Yoris Herdiyanto, Aleksander