PERFORMANCE EVALUATION OF PROJECT MANAGEMENT IMPLEMENTATION CASE: BGC-TEG PROJECT IN PT WASCO ENGINEERING INDONESIA
PT Wasco Engineering Indonesia is a company that the main business as fabricator contractor for oil and gas and renewable energy industry located at Batam, they have operated for more than 15 years. The company produce types of facilities such as Process Packages module, FPSO (Floating Production...
Saved in:
Main Author: | Nur Muhadi, Moh |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62280 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF PROJECT MANAGEMENT IMPLEMENTATION CASE STUDY: ENVIRONMENTAL PHYTOREMEDIATION PROJECT IN PT. ABADI BERSAMA CAHAYA INDONESIA
by: Yudana Ruslan, Rezy -
IMPLEMENTATION OF RISK MANAGEMENT STANDARD TO ACCELERATE PROJECT PERFORMANCE CASE STUDY IN PT PEMBANGUNAN RUMAH INDONESIA
by: Mayangsari, Dewi -
IMPLEMENTATION OF RISK MANAGEMENT STANDARD TO ACCELERATE PROJECT PERFORMANCE CASE STUDY IN PT PEMBANGUNAN RUMAH INDONESIA
by: Mayangsari, Dewi -
PERFORMANCE EVALUATION ON PROJECT MANAGEMENT IMPLEMENTATION AT PT. INDOJAYA LIMA ABADI (CASE STUDY : HOME OFFICE RENOVATION AND SITE DEVELOPMENT OF PT. GLOBAL CREATIVE FARMER)
by: Faza Gunawan, Fulki -
PROPOSED PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK) IMPLEMENTATION IN PT PERTAMINA HULU ENERGI FIELD SIAK-KAMPAR PROJECTS
by: Abdillah Wiguna, Muhammad