OCCUPATIONAL HEALTH AND SAFETY RISK MANAGEMENT UNDERBRIDGE BRIDGE CONSTRUCTION AT STATION 6+200 ON PADANG â SICINCIN TOLL ROAD
Construction is one sector that has a high level of risk of work accidents. The main causes of high work accidents in construction projects are closely related to the unique project characteristics, work location, weather conditions, execution time, use of heavy equipment, and a large number of work...
Saved in:
Main Author: | Ramadhana Catri, Putra |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62432 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION OF SLOPE REINFORCEMENT DESIGN USING SOIL NAILING IN TOLL ROADCASE STUDY: SICINCIN - PADANG TOLL ROAD SECTION
by: Seprian, Dwi -
LOAD TRANSFER MECHANISM ON LOAD TRANSFER PLATFORM FOR SOFT SOIL REINFORCEMENT WITH RIGID INCLUSION IN PADANG-SICINCIN TOLL PROJECT
by: Afandi, Rizzal -
DESAIN OF SOIL IMPROVEMENT WITH RIGID INCLUSION FOR HIGHWAY IN PADANG-SICINCIN
by: Vincent -
ROAD SAFETY INVESTIGATION IN PADALARANG-CILEUNYI TOLL ROAD
by: EKA PUTRA (NIM : 15006155); Pembimbing : Aine Kusumawati, ST, MT, PhD, RIDHO -
ROAD SAFETY INVESTIGATION IN CIPULARANG TOLL ROAD
by: Nabila, Syahla