PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO

The fulfillment of national energy must be increased due to the increasing demand for electrical energy every year. Therefore, the Government of Indonesia is accelerating the use of New Renewable Energy (NRE) and making plans for the development of electricity, one of which is a hydroelectric power...

Full description

Saved in:
Bibliographic Details
Main Author: CHRISANTY, NERISSA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/62495
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:62495
spelling id-itb.:624952022-01-10T09:15:14ZPERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO CHRISANTY, NERISSA Indonesia Final Project MHPP, dam, reliable discharge, power potential INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62495 The fulfillment of national energy must be increased due to the increasing demand for electrical energy every year. Therefore, the Government of Indonesia is accelerating the use of New Renewable Energy (NRE) and making plans for the development of electricity, one of which is a hydroelectric power plant. Gorontalo Province is one of the areas included in the development plan. The Bone-1 Mini-hydro Power Plant (MHPP) is planned in Poduwoma Village, Bone Bolango Regency, Gorontalo Province. PLTM Bone-1 is a power plant with a reservoir type in the form of a dam. PLTM Bone-1 has a watershed area of 1,000.934 km2. The PLTM Bone-1 consists of the main building and auxiliary buildings, namely cofferdam I, cofferdam II, main dam body, intake building, penstock, turbine, power house, and tailrace. The water availability used in the PLTM Bone-1 is 85.517 m3/s for two turbines. PLTM Bone-1 can generate power potential of 2 x 4.621 MW and the total profit reaches Rp 108,924,589,839.18 within one year. The planned construction cost of the PLTM Bone-1 is Rp 161,604,225,363.48. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The fulfillment of national energy must be increased due to the increasing demand for electrical energy every year. Therefore, the Government of Indonesia is accelerating the use of New Renewable Energy (NRE) and making plans for the development of electricity, one of which is a hydroelectric power plant. Gorontalo Province is one of the areas included in the development plan. The Bone-1 Mini-hydro Power Plant (MHPP) is planned in Poduwoma Village, Bone Bolango Regency, Gorontalo Province. PLTM Bone-1 is a power plant with a reservoir type in the form of a dam. PLTM Bone-1 has a watershed area of 1,000.934 km2. The PLTM Bone-1 consists of the main building and auxiliary buildings, namely cofferdam I, cofferdam II, main dam body, intake building, penstock, turbine, power house, and tailrace. The water availability used in the PLTM Bone-1 is 85.517 m3/s for two turbines. PLTM Bone-1 can generate power potential of 2 x 4.621 MW and the total profit reaches Rp 108,924,589,839.18 within one year. The planned construction cost of the PLTM Bone-1 is Rp 161,604,225,363.48.
format Final Project
author CHRISANTY, NERISSA
spellingShingle CHRISANTY, NERISSA
PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
author_facet CHRISANTY, NERISSA
author_sort CHRISANTY, NERISSA
title PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
title_short PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
title_full PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
title_fullStr PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
title_full_unstemmed PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
title_sort perencanaan pembangkit listrik tenaga minihidro bone-1 di desa poduwoma, kab. bone bolango, provinsi gorontalo
url https://digilib.itb.ac.id/gdl/view/62495
_version_ 1822931939798024192