PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO
The fulfillment of national energy must be increased due to the increasing demand for electrical energy every year. Therefore, the Government of Indonesia is accelerating the use of New Renewable Energy (NRE) and making plans for the development of electricity, one of which is a hydroelectric power...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62495 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!