PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO BONE-1 DI DESA PODUWOMA, KAB. BONE BOLANGO, PROVINSI GORONTALO

The fulfillment of national energy must be increased due to the increasing demand for electrical energy every year. Therefore, the Government of Indonesia is accelerating the use of New Renewable Energy (NRE) and making plans for the development of electricity, one of which is a hydroelectric power...

Full description

Saved in:
Bibliographic Details
Main Author: CHRISANTY, NERISSA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/62495
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items