PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH

One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existen...

Full description

Saved in:
Bibliographic Details
Main Authors: , PRATAMA TIRZA S S, , Dian Sestiningayu. ST., MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132295/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada