PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existen...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132295/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Be the first to leave a comment!