PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existen...
Saved in:
Main Authors: | , PRATAMA TIRZA S S, , Dian Sestiningayu. ST., MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132295/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
RETROFIT PANEL KONTROL AVR (AUTOMATIC VOLTAGE REGULATOR)
DI PT INDONESIA POWER UBP MRICA SUB UNIT PLTA JELOK
by: , NURUZZAMAN ASYGAF, et al.
Published: (2014) -
Studi manajemen pengembangan kawasan wisata alam Kebun Tlogo, Tuntang Kabupaten Semarang
by: , KRISTIANTI, Hady, et al.
Published: (2006) -
Pengatur tegangan keluaran Generator Induksi akibat perubahan beban dan penurunan debit pada Pembangkit Listrik Tenaga Mikrohidro
by: , NASUTION, Zulkarnaen, et al.
Published: (2007) -
Analisis finansial PLTA Asahan III
by: , KISWANTO, et al.
Published: (2009) -
Pengembangan Pembangkit Listrik Tenaga Ombak
by: Perpustakaan UGM, i-lib
Published: (1998)