PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existen...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132295/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.132295 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1322952016-03-04T08:06:39Z https://repository.ugm.ac.id/132295/ PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH , PRATAMA TIRZA S S , Dian Sestiningayu. ST., MT. ETD One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existence system at the PT.PLN Jawa Bali I Sektor Mrica. For the past few years, its operating was less optimal of the debit entry into generator was caused by the silting process in the water due to numerous growths of Eceng Gondok population at Tuntang River. In order to resolve the problem, it needs several methods with various phases in it. The first processes is that analysing the field condition, discussing it with the experts, and taking the data to analyse the problem which is appeared in the field. Afterwards, the data processed and from the result process can be withdrawn the conclusion and it emerged several recommendations. One of the technical recommendations is that to execute dredging periodically by using the excavator so that the debit entry can be suitable as it is expected to evoke the maximum power, 20, 48 MW for the sake of the citizen�s development and growth at PLTA Jelok Kab. Semarang Provinsi Jawa Tengah. Keywords: PLTA Jelok, debit, Eceng Gondok [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , PRATAMA TIRZA S S and , Dian Sestiningayu. ST., MT. (2014) PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , PRATAMA TIRZA S S , Dian Sestiningayu. ST., MT. PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH |
description |
One of the conditions that should be filled in providing the good quality
electrical power is the on-guard stability of the electrical power system which is
supported by the proper requirement of flow debit. The flow debit becomes one of the
large power supporters to evoke the PLTA generator existence system at the PT.PLN
Jawa Bali I Sektor Mrica. For the past few years, its operating was less optimal of the
debit entry into generator was caused by the silting process in the water due to
numerous growths of Eceng Gondok population at Tuntang River. In order to resolve
the problem, it needs several methods with various phases in it. The first processes is
that analysing the field condition, discussing it with the experts, and taking the data to
analyse the problem which is appeared in the field. Afterwards, the data processed
and from the result process can be withdrawn the conclusion and it emerged several
recommendations. One of the technical recommendations is that to execute dredging
periodically by using the excavator so that the debit entry can be suitable as it is
expected to evoke the maximum power, 20, 48 MW for the sake of the citizen�s
development and growth at PLTA Jelok Kab. Semarang Provinsi Jawa Tengah.
Keywords: PLTA Jelok, debit, Eceng Gondok |
format |
Theses and Dissertations NonPeerReviewed |
author |
, PRATAMA TIRZA S S , Dian Sestiningayu. ST., MT. |
author_facet |
, PRATAMA TIRZA S S , Dian Sestiningayu. ST., MT. |
author_sort |
, PRATAMA TIRZA S S |
title |
PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH |
title_short |
PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH |
title_full |
PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH |
title_fullStr |
PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH |
title_full_unstemmed |
PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH |
title_sort |
pengerukan sungai tuntang untuk meningkatkan debit guna optimalisasi pembangkit listrik tenaga air (plta) jelok kab. semarang provinsi jawa tengah |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2014 |
url |
https://repository.ugm.ac.id/132295/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823 |
_version_ |
1681233477048991744 |