PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH

One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existen...

Full description

Saved in:
Bibliographic Details
Main Authors: , PRATAMA TIRZA S S, , Dian Sestiningayu. ST., MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132295/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.132295
record_format dspace
spelling id-ugm-repo.1322952016-03-04T08:06:39Z https://repository.ugm.ac.id/132295/ PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH , PRATAMA TIRZA S S , Dian Sestiningayu. ST., MT. ETD One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existence system at the PT.PLN Jawa Bali I Sektor Mrica. For the past few years, its operating was less optimal of the debit entry into generator was caused by the silting process in the water due to numerous growths of Eceng Gondok population at Tuntang River. In order to resolve the problem, it needs several methods with various phases in it. The first processes is that analysing the field condition, discussing it with the experts, and taking the data to analyse the problem which is appeared in the field. Afterwards, the data processed and from the result process can be withdrawn the conclusion and it emerged several recommendations. One of the technical recommendations is that to execute dredging periodically by using the excavator so that the debit entry can be suitable as it is expected to evoke the maximum power, 20, 48 MW for the sake of the citizen�s development and growth at PLTA Jelok Kab. Semarang Provinsi Jawa Tengah. Keywords: PLTA Jelok, debit, Eceng Gondok [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , PRATAMA TIRZA S S and , Dian Sestiningayu. ST., MT. (2014) PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, PRATAMA TIRZA S S
, Dian Sestiningayu. ST., MT.
PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
description One of the conditions that should be filled in providing the good quality electrical power is the on-guard stability of the electrical power system which is supported by the proper requirement of flow debit. The flow debit becomes one of the large power supporters to evoke the PLTA generator existence system at the PT.PLN Jawa Bali I Sektor Mrica. For the past few years, its operating was less optimal of the debit entry into generator was caused by the silting process in the water due to numerous growths of Eceng Gondok population at Tuntang River. In order to resolve the problem, it needs several methods with various phases in it. The first processes is that analysing the field condition, discussing it with the experts, and taking the data to analyse the problem which is appeared in the field. Afterwards, the data processed and from the result process can be withdrawn the conclusion and it emerged several recommendations. One of the technical recommendations is that to execute dredging periodically by using the excavator so that the debit entry can be suitable as it is expected to evoke the maximum power, 20, 48 MW for the sake of the citizen�s development and growth at PLTA Jelok Kab. Semarang Provinsi Jawa Tengah. Keywords: PLTA Jelok, debit, Eceng Gondok
format Theses and Dissertations
NonPeerReviewed
author , PRATAMA TIRZA S S
, Dian Sestiningayu. ST., MT.
author_facet , PRATAMA TIRZA S S
, Dian Sestiningayu. ST., MT.
author_sort , PRATAMA TIRZA S S
title PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
title_short PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
title_full PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
title_fullStr PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
title_full_unstemmed PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
title_sort pengerukan sungai tuntang untuk meningkatkan debit guna optimalisasi pembangkit listrik tenaga air (plta) jelok kab. semarang provinsi jawa tengah
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/132295/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72823
_version_ 1681233477048991744