DEVELOPMENT OF OPERATIONAL VISUALIZATION ON SUSTAINABLE AGRO ENERGY SYSTEM CASE STUDY: PLTM KAMBANGAN
Mini-hydro Power Plant (PLTM) is a New and Renewable Energy (EBT) Power Plant that supports the government's target of implementing NRE by 23.2% by 2028. PLTM is very good to be integrated with integrated agriculture and also eco-tourism in order to help empower land that is hereinafter referre...
Saved in:
Main Author: | Muhammad Irfan, Azka |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62623 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDI KELAYAKAN DAN DESAIN AWAL PLTM LOGAWA, BAYUMAS-JAWA TENGAH
by: Hafidz Pramudia, Fuji -
FEASIBILITY STUDY OF MOORING WINCH SYSTEM ON NUSA KAMBANGAN JETTY AND KARANGTALUN JETTY FOR PT. SOLUSI BANGUN INDONESIA
by: Mangaraja Sinay, Daniel -
FRANCIS TURBINE 2 MW DESIGN WITH CASE STUDY KAMBANGAN MINI HYDRO POWER WITH HEAD 87 M AND DISCHARGE 2.8 M3/S
by: Danu Aditya Rachman, Rovky -
DESIGN OF ALERTING SYSTEM FOR BEYOND VISUAL LINE OF SIGHT OPERATIONAL CARGO DELIVERY UAV
by: Sonaria, Enita -
PROSPECTIVE STUDY OF THE HYDROPOWER PLANTS POTENTIAL AS SUSTAINABLE AND GREEN ENERGY
by: Prasetya Rachman, Rendy