SEDIMENTATION ANALYSIS IN CILIWUNG DIVERSION TUNNEL
The construction of the Ciliwung Diversion Tunnel–East Flood Canal is carried out in order to maximize the capacity of the main drainage channels such as the East Flood Canal and reduce the flood water level in the Ciliwung River. This diversion is planned to be able to divert some of the flood disc...
Saved in:
Main Author: | FRANSISCA RIA SILALAHI, IRA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62660 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF THE IMPLEMENTATION OF INLETCONSTRUCTION AND METHODS OF OPERATION ANDMAINTENANCE IN CILIWUNG RIVER - EAST FLOOD CANAL(KBT) FLOOD DIVERSION TUNNEL
by: Kurnia Sari, Ika -
STUDY OF THE SEDIMENTATION'S EFFECT FOR CAPACITY AND MORPHOLOGICAL CHANGES ON THE CILIWUNG RIVER IN SECTION KALIBATA - KAMPUNG MELAYU
by: Tadzkia, Ade -
RETAINING WALL AND CONCRETE LINING TUNNEL DESIGN OF CILIWUNG RIVER â CIPINANG RIVER FLOODWAY
by: Pangihutan, Ronaldo -
BARRAGE DESIGN OF CILIWUNG FLOODWAY ON CILIWUNG RIVERS AS JAKARTA FLOOD CONTROL
by: Sena Pasereng, Bernardus -
THE EFFECT OF CILIWUNG RIVER FLOOD DISCHARGE ON TIDAL FLOOD IN THE CILIWUNG RIVER ESTUARY AREA
by: Naufal Harman, Afif