SEDIMENTATION ANALYSIS IN CILIWUNG DIVERSION TUNNEL

The construction of the Ciliwung Diversion Tunnel–East Flood Canal is carried out in order to maximize the capacity of the main drainage channels such as the East Flood Canal and reduce the flood water level in the Ciliwung River. This diversion is planned to be able to divert some of the flood disc...

Full description

Saved in:
Bibliographic Details
Main Author: FRANSISCA RIA SILALAHI, IRA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/62660
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first