RISK ALLOCATION IN PROJECT FINANCE: A CASE STUDY OF THE 2X100 MW COAL-FIRED POWER PLANT PROJECT IN KALIMANTAN
In project finance, the involved parties will be exposed to various risks. The ability to identify, manage and allocate those risk is of significant important for the success of a project. After being identified, many of the project risks are allocated to either project company and/or Government/PLN...
Saved in:
Main Author: | Ansari NS, Roni |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/63216 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FINANCIAL ANALYSIS OF 1Ã200 MW COAL BIOMASS COâ FIRING POWER PLANT EXPANSION PROJECT
by: Dimas Fhadjrin, Reynaldi -
BLOWDOWN BOILER MASS FLOW SIMULATION IN MAINTAINING RELIABILITY AND EFFICIENCY OF COAL FIRED STEAM POWER PLANT (CASE STUDY IN PLTU OMBILIN 2 X 100 MW)
by: Sefriadi, Odi -
REDESIGN OF COAL SHED AT JAWA 9 & 10 COAL FIRED STEAM POWER PLANT PROJECT
by: Alfarazi, Muhammad -
SMART APPROACH TO DETERMINE SOLUTION OF COAL QUALITY DISCREPANCY IN COAL-FIRED POWER PLANT PROJECT UNDER BINDING PROJECT FINANCE SCHEME (CASE STUDY: PT SEMANGAT BERJUANG TERUS)
by: Iman Ramadhan, Matiinu -
GEOMETRICAL REVERSE ENGINEERING OF THE BLADES OF PRIMARY AIR FAN FOR 660 MW COAL-FIRED THERMAL POWER PLANT
by: Setyawan, Sony