THE EVALUATION OF CO 2 REMOVAL CONTRACT (A CASE STDY OF RANDEGAN AREA)

In 2020, Pertamina Group was faced with a triple shock challenge. This condition requires Pertamina Group to implement an opex efficiency strategy of 30%. Meanwhile, PT Pertamina EP Jatibarang Field has a contract for renting a CO2 removal plant in the Randegan area, which ends in November 2021....

Full description

Saved in:
Bibliographic Details
Main Author: Wahyu Alimsyah, Tomi
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/63840
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia