THE EVALUATION OF CO 2 REMOVAL CONTRACT (A CASE STDY OF RANDEGAN AREA)
In 2020, Pertamina Group was faced with a triple shock challenge. This condition requires Pertamina Group to implement an opex efficiency strategy of 30%. Meanwhile, PT Pertamina EP Jatibarang Field has a contract for renting a CO2 removal plant in the Randegan area, which ends in November 2021....
Saved in:
Main Author: | Wahyu Alimsyah, Tomi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/63840 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
HOW CUSTOMER BASED-BRAND COMMUNITY CONTRIBUTES TO BUILD BRAND EQUITY (CASE STDY OF LOCAL BEAUTY BRAND: CONFITTY)
by: Muqitaputri Gunawan, Salma -
INVESTMENT EVALUATION OF CO2 REMOVAL PLANT CASE STUDY AT BAMBU BESAR STRUCTURE
by: Yusuf Indra Surya, Mochammad -
DEVELOPING EXTENDED WORK ORDER MANAGEMENT SYSTEM FOR GARMENT PRODUCTION USING SYSTEM DYNAMIC AND CIRCULAR ECONOMY APPROACH: CASE STUDY POLITEKNIK STTT BANDUNG
by: Tomi -
FINANCIAL HEALTH ASSESSMENT FOR SPECIFIC COMPANY BASE ON DAM BUSINESS (CASE STUDY: PERUM JASA TIRTA II)
by: Kurniawan, Tomi -
MATURITY ASSESSMENT TO IMPROVE MINING CONTRACT LIFECYCLE MANAGEMENT AT PT KALTIM PRIMA COAL (CASE STUDY: CONTRACT MINING DIVISION)
by: Christanto, Harry