KAJIAN TATA KELOLA LINGKUNGAN MULTI LEVEL PADA PROGRAM PEMULIHAN MATA PENCAHARIAN MASYARAKAT TERDAMPAK AKUISISI LAHAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA PANAS BUMI MUARA LABUH, SOLOK SELATAN
The construction of Geothermal Power Plant (PLTP) in Muara Labuh Area, South Solok is part of the National Strategic Project in accelerating the development of electricity infrastructure. The construction of this project is acquiring land belonging to the local community and arising vulnerabilities...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/63948 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |