KAJIAN TATA KELOLA LINGKUNGAN MULTI LEVEL PADA PROGRAM PEMULIHAN MATA PENCAHARIAN MASYARAKAT TERDAMPAK AKUISISI LAHAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA PANAS BUMI MUARA LABUH, SOLOK SELATAN
The construction of Geothermal Power Plant (PLTP) in Muara Labuh Area, South Solok is part of the National Strategic Project in accelerating the development of electricity infrastructure. The construction of this project is acquiring land belonging to the local community and arising vulnerabilities...
Saved in:
Main Author: | Amarrilo Adiprana, Fikri |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/63948 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
POLA SPASIAL DAN DINAMIKA PERKEMBANGAN PERKOTAAN SERTA PENGARUHNYA TERHADAP DAYA DUKUNG LAHAN PERTANIAN PADA WILAYAH PENGEMBANGAN CIAYUMAJAKUNING, JAWA BARAT
by: Amarrilo Adiprana, Fikri -
Pengaruh Industrialisasi terhadap Sistim Mata Pencaharian Hidup
by: Poerwanto, Hari, et al.
Published: (1977) -
STUDY OF THE IMPACT OF KAMBANG-MUARA LABUH PUBLIC ROAD TO REGIONAL DEVELOPMENT OF PESISIR SELATAN REGENCY
by: Erniwati -
STUDI KONEKYIVITAS BAWAH PERMUKAAN SUMUR INJEKSI DAN PRODUKSI PADA LAPANGAN GEOTERMAL MUARA LABUH
by: Agustinus H Sihotang, M -
MATA PENCAHARIAN MASYARAKAT PESISIR PANTAI POPOH KABUPATEN TULUNGAGUNG TAHUN 1972-1982
by: WENNY SURYANINGTYAS, 121311433070
Published: (2019)