METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE

Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong...

Full description

Saved in:
Bibliographic Details
Main Author: Imanuddin, Hanif
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/64158
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64158
spelling id-itb.:641582022-04-04T14:28:04ZMETODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE Imanuddin, Hanif Pertambangan dan operasi berkaitan Indonesia Final Project in place, bottom water drive, dimensionless P/Z, material balance INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64158 Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong water but this method is used in very weak water drive, so the effect of driving mechanism can be neglected. With the water influx from the aquifer, there is a tendency curve P / Z make some deviation from the initial conditions. So later, IGIP value obtained does not represent the original condition. Therefore, in this study, the curve of P / Z vs. Gp was modicated from material balance equation by including parameters of water influx and water production. For validating the proposed method, we analyze and compare the value of IGIP that obtained from this method with value of IGIP from reservoir model. In sensitivity analysis for every change of aquifer rock property parameters, the equation P / Z dimensionless by calculating the maximum value of the compressibility gives maximum error only 5% of IGIP reservoir models, whereas the sensitivity analysis for reservoir parameters, especially initial porosity reservoir, IGIP maximum error is 1.6%. Moreover, this study discusses the comparison between proposed method with the previous method, Havlena Odeh, and applying technic of proposed methods in the field case. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Imanuddin, Hanif
METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
description Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong water but this method is used in very weak water drive, so the effect of driving mechanism can be neglected. With the water influx from the aquifer, there is a tendency curve P / Z make some deviation from the initial conditions. So later, IGIP value obtained does not represent the original condition. Therefore, in this study, the curve of P / Z vs. Gp was modicated from material balance equation by including parameters of water influx and water production. For validating the proposed method, we analyze and compare the value of IGIP that obtained from this method with value of IGIP from reservoir model. In sensitivity analysis for every change of aquifer rock property parameters, the equation P / Z dimensionless by calculating the maximum value of the compressibility gives maximum error only 5% of IGIP reservoir models, whereas the sensitivity analysis for reservoir parameters, especially initial porosity reservoir, IGIP maximum error is 1.6%. Moreover, this study discusses the comparison between proposed method with the previous method, Havlena Odeh, and applying technic of proposed methods in the field case.
format Final Project
author Imanuddin, Hanif
author_facet Imanuddin, Hanif
author_sort Imanuddin, Hanif
title METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
title_short METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
title_full METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
title_fullStr METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
title_full_unstemmed METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
title_sort metode usulan analisa material balance p/z tak berdimensi untuk sumur gas bertenaga pendorong bottom water drive
url https://digilib.itb.ac.id/gdl/view/64158
_version_ 1822932359343767552