METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64158 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:64158 |
---|---|
spelling |
id-itb.:641582022-04-04T14:28:04ZMETODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE Imanuddin, Hanif Pertambangan dan operasi berkaitan Indonesia Final Project in place, bottom water drive, dimensionless P/Z, material balance INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64158 Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong water but this method is used in very weak water drive, so the effect of driving mechanism can be neglected. With the water influx from the aquifer, there is a tendency curve P / Z make some deviation from the initial conditions. So later, IGIP value obtained does not represent the original condition. Therefore, in this study, the curve of P / Z vs. Gp was modicated from material balance equation by including parameters of water influx and water production. For validating the proposed method, we analyze and compare the value of IGIP that obtained from this method with value of IGIP from reservoir model. In sensitivity analysis for every change of aquifer rock property parameters, the equation P / Z dimensionless by calculating the maximum value of the compressibility gives maximum error only 5% of IGIP reservoir models, whereas the sensitivity analysis for reservoir parameters, especially initial porosity reservoir, IGIP maximum error is 1.6%. Moreover, this study discusses the comparison between proposed method with the previous method, Havlena Odeh, and applying technic of proposed methods in the field case. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Pertambangan dan operasi berkaitan |
spellingShingle |
Pertambangan dan operasi berkaitan Imanuddin, Hanif METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE |
description |
Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use
to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that
does not have a driving mechanism, especially strong water but this method is used in very weak water drive, so the
effect of driving mechanism can be neglected. With the water influx from the aquifer, there is a tendency curve P / Z
make some deviation from the initial conditions. So later, IGIP value obtained does not represent the original condition.
Therefore, in this study, the curve of P / Z vs. Gp was modicated from material balance equation by including parameters
of water influx and water production. For validating the proposed method, we analyze and compare the value of IGIP
that obtained from this method with value of IGIP from reservoir model. In sensitivity analysis for every change of
aquifer rock property parameters, the equation P / Z dimensionless by calculating the maximum value of the
compressibility gives maximum error only 5% of IGIP reservoir models, whereas the sensitivity analysis for reservoir
parameters, especially initial porosity reservoir, IGIP maximum error is 1.6%. Moreover, this study discusses the
comparison between proposed method with the previous method, Havlena Odeh, and applying technic of proposed
methods in the field case. |
format |
Final Project |
author |
Imanuddin, Hanif |
author_facet |
Imanuddin, Hanif |
author_sort |
Imanuddin, Hanif |
title |
METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE |
title_short |
METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE |
title_full |
METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE |
title_fullStr |
METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE |
title_full_unstemmed |
METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE |
title_sort |
metode usulan analisa material balance p/z tak berdimensi untuk sumur gas bertenaga pendorong bottom water drive |
url |
https://digilib.itb.ac.id/gdl/view/64158 |
_version_ |
1822932359343767552 |