METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong...
Saved in:
Main Author: | Imanuddin, Hanif |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64158 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERAMALAN IPR TAK BERDIMENSI UNTUK SUMUR TERSTIMULASI MENGGUNAKAN MATRIX ACIDIZING PADA RESERVOIR HETEROGEN BERTENAGA PENDORONG GAS TERLARUT
by: Aditya Pratama, Rezha -
PENENTUAN ORIGINAL GAS IN PLACE DENGAN METODE MATERIAL BALANCE ANALYSIS MENGGUNAKAN TEKANAN KEPALA SUMUR UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE
by: Panji Reksaputra, Dimas -
STUDI STRATEGI INJEKSI WAG TIDAK TERCAMPUR PADA RESERVOIR BERTENAGA PENDORONG GAS TERLARUT
by: Darajati K P, Veronica -
PERSAMAAN USULAN UNTUK MENGHITUNG WAKTU TEMBUS AIR PADA SUMUR HORIZONTAL DENGAN BOTTOM WATER DRIVE MECHANISM
by: Fuzail, Muhammad -
ANALISIS RESERVOIR KOMPARTEMEN BERTENAGA PENDORONG TUDUNG GAS DENGAN MENGGUNAKAN PERSAMAAN MARHAENDRAJANA â BLASINGAME
by: Restu Fairuz, Ajeng