METODE USULAN ANALISA MATERIAL BALANCE P/Z TAK BERDIMENSI UNTUK SUMUR GAS BERTENAGA PENDORONG BOTTOM WATER DRIVE

Material balance is often used for the determination of initial gas in place of a reservoir. P/Z vs. Gp method usually use to estimate the value of a IGIP in gas production field. However, in reality, this method is often used for the field that does not have a driving mechanism, especially strong...

Full description

Saved in:
Bibliographic Details
Main Author: Imanuddin, Hanif
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/64158
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first