PERSAMAAN USULAN UNTUK MENGHITUNG WAKTU TEMBUS AIR PADA SUMUR HORIZONTAL DENGAN BOTTOM WATER DRIVE MECHANISM
Reservoir with bottom water drive mechanism tend to cause water coning phenomenon. This phenomenon can be minimized by using horizontal well. However, horizontal wells cannot completely eliminate water coning. Otherwise, water coning will be formed until the water is produce. The production of water...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64232 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Reservoir with bottom water drive mechanism tend to cause water coning phenomenon. This phenomenon can be minimized by using horizontal well. However, horizontal wells cannot completely eliminate water coning. Otherwise, water coning will be formed until the water is produce. The production of water will decrease oil production, increase production cost, and it is necessary to provide surface facilities to overcome the water production which is produce at surface. Water breakthrough depend on some parameters, such as fluid flow rate, porosity, horizontal well length, density difference, distance perforation to WOC, mobility ratio, and permeability anisotropy.
The objective of this paper is to estimate water breakthrough time in horizontal well by conducting sensitivity analysis of affecting parameters. A commercial 3-D simulator was used in modeling and determining time to breakthrough. Therefore, non-linear regression was conducted by using sensitivity analysis result in obtaining numerical equation of time to breakthrough in horizontal well. |
---|