IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)

The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the B...

Full description

Saved in:
Bibliographic Details
Main Author: Prasetya, Yuda
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/64622
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64622
spelling id-itb.:646222022-05-30T13:26:13ZIMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL) Prasetya, Yuda Manajemen umum Indonesia Theses lighting systems, energy management, current reality tree, analytical hierarchy process INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64622 The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the Badak LNG plant being less competitive in the competition between Global LNG Plants. The results of the benchmarking operational performance review conducted by Phillip Townsend Associates Inc (PTAI) in 2018, obtained the fact that the percentage of energy usage used for LNG production activities at the Badak LNG plant was 12.0%, while the energy usage of the global LNG plant which was included in the age peer group with an age group of which is relatively the same as the Badak LNG plant is 9.1%. To pursue the energy usage efficiency gap, the Badak LNG plant implements an energy management system, engineering studies have been carried out to improve efficiency in several systems. Considering the operation of the Badak LNG plant, improvements will be made to lighting systems that meet the criteria of low investment cost but provide high return on investment and a short pay-back period. By using the current reality tree (CRT) and interviews with key stakeholders, the main cause of inefficiency in lighting systems is there is no updates to the lighting systems specification. Using the analytical hierarchy process (AHP), the best alternative solution to reduce energy consumption in lighting systems is retrofit to an LED bulb and install an occupancy sensor. This alternative will have the impact of reducing energy consumption by 6.924 MW/year or the equivalent of cost saving USD 1,315,599/year. And total energy usage decrease by 0,52% text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Prasetya, Yuda
IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
description The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the Badak LNG plant being less competitive in the competition between Global LNG Plants. The results of the benchmarking operational performance review conducted by Phillip Townsend Associates Inc (PTAI) in 2018, obtained the fact that the percentage of energy usage used for LNG production activities at the Badak LNG plant was 12.0%, while the energy usage of the global LNG plant which was included in the age peer group with an age group of which is relatively the same as the Badak LNG plant is 9.1%. To pursue the energy usage efficiency gap, the Badak LNG plant implements an energy management system, engineering studies have been carried out to improve efficiency in several systems. Considering the operation of the Badak LNG plant, improvements will be made to lighting systems that meet the criteria of low investment cost but provide high return on investment and a short pay-back period. By using the current reality tree (CRT) and interviews with key stakeholders, the main cause of inefficiency in lighting systems is there is no updates to the lighting systems specification. Using the analytical hierarchy process (AHP), the best alternative solution to reduce energy consumption in lighting systems is retrofit to an LED bulb and install an occupancy sensor. This alternative will have the impact of reducing energy consumption by 6.924 MW/year or the equivalent of cost saving USD 1,315,599/year. And total energy usage decrease by 0,52%
format Theses
author Prasetya, Yuda
author_facet Prasetya, Yuda
author_sort Prasetya, Yuda
title IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
title_short IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
title_full IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
title_fullStr IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
title_full_unstemmed IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
title_sort improvement of energy consumption in compliance to iso 50001 energy management systems (case study lighting systems at pt badak ngl)
url https://digilib.itb.ac.id/gdl/view/64622
_version_ 1822004616112373760