IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the B...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64622 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!