IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the B...
Saved in:
Main Author: | Prasetya, Yuda |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64622 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TRANSITION PLAN FOR ENERGY MANAGEMENT SYSTEMS FROM ISO 50001:2011 TO ISO 50001:2018 AT PT PUPUK KALIMANTAN TIMUR
by: Mustanginah -
DECISION MAKING ANALYSIS IN SELECTING STRATEGY TO IMPROVE STEAM TRAP INTEGRITY AT PT BADAK NGL
by: Wayan Yuda Semaradipta, I -
KNOWLEDGE MANAGEMENT (KM) IMPROVEMENT AT PRODUCTION DIVISION - PT. BADAK NGL
by: Primadi Sjarief, Widianto -
IMPROVEMENT OF SERGAP CONSUMABLE MATERIALS INVENTORY MANAGEMENT IN COMMUNITY WAREHOUSE PT BADAK NGL
by: Chandra Frayekti, Melly -
IDENTIFICATION FOR FUEL GAS IMPROVEMENT PROGRAM, CASE STUDY: PT BADAK NGL
by: Arief Setiawan, Mohammad