IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)

The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the B...

全面介紹

Saved in:
書目詳細資料
主要作者: Prasetya, Yuda
格式: Theses
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/64622
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!