PLANNING AND STRATEGY DEVELOPMENT FOR PROJECT COMPLETION ASSURANCE IMPROVEMENT (CASE STUDY: LAND HANDOVER PROJECT IN PT CPAC INDONESIA)
PT CPAC is highly committed in protecting people and environment and protection of its assets and the environment where the company operates by managing environmental impact caused by its exploration and production activities including Hydrocarbon Impacted Soil (HIS). After meeting environmental sta...
Saved in:
Main Author: | Surya, Angga |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/65057 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MINIMIZING DELAY TIME OF PROJECT COMPLETION (CASE OF PT.ANXX)
by: Eka Putra, Kaizman -
PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
by: Ismayanto, Doma -
PROPOSE STRATEGY FOR PROJECT MANAGEMENT IMPROVEMENT AT PT AKSAMAIA REKTA NUSA
by: Fahri Majid, Ferial -
IMPROVEMENT OF QUALITY ASSURANCE PROGRAM FOR PIPELINE REPAIR PROJECT IN OIL AND GAS COMPANY BY USING STATISTICAL QUALITY CONTROL AND SIX SIGMA
by: Aditia Buana Sucipto, Nur -
PROPOSED OPERATIONS STRATEGY FOR INDIHOME TO IMPROVE ASSURANCE PERFORMANCE IN PT TELEKOMUNIKASI INDONESIA SURABAYA SELATAN
by: Hedianti Putri, Devyantasa