PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS

WK Rokan is the most productive oil block in the history of Indonesia’s oil and gas, has more than 12 thousand active oil wells scattered in more than 100 active fields operating and contributes around 23.5% of national oil production. One of the active fields in WK Rokan is the Petko field which...

Full description

Saved in:
Bibliographic Details
Main Author: Syukron, Muhammad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/66732
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66732
spelling id-itb.:667322022-07-15T08:16:09ZPROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS Syukron, Muhammad Manajemen umum Indonesia Theses Kepner Tregoe, 5-Whys, Simple Multi Attribute Assessment Technique, Forum Group Discussion, Situation Appraisal, Problem Analysis, Decision Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66732 WK Rokan is the most productive oil block in the history of Indonesia’s oil and gas, has more than 12 thousand active oil wells scattered in more than 100 active fields operating and contributes around 23.5% of national oil production. One of the active fields in WK Rokan is the Petko field which has around 400 production wells with a production of nearly 17,000 Barrels Oil Per Day (BOPD). Production wells with high reliability without operational disruption are the company's target to obtain optimal production. One of the crucial problems related to the reliability of production wells in the Petko field is the presence of associated gas or back pressure in the annulus casing of the production wells which causes a gas lock to occur in Electrical Submersible Pump (ESP). Production wells become shutting down and then impact losses of oil production called Loss Production Opportunity (LPO). Production wells with high associated gas or back pressure are called gassy wells. The purpose of this final project is to conduct a comprehensive analysis to mitigate the problem of gassy wells in the Petko field so that appropriate recommendations and solutions are resulted from several identified alternatives to obtain optimal and reliable production well operations and also prevent incidents that have an impact on safety of the worker and surrounding community even environmental issues in the operation area. Gassy well problems were assessed using the Kepner Tregoe Situation Assessment (KT). Then find the root of the problem using the Kepner Tregoe (KT) Problem Analysis and verified with the 5-Whys method. The eight stages of the Simple Multi Attribute Rating Technique (SMART) method were carried out to identify decision makers, alternatives and attributes and then attribute weighting to each alternative that had been developed so that a provisional decision was obtained and accompanied by a sensitivity analysis on all alternatives. The analysis and application of the Kepner Tregoe (KT) and SMART methods are carried out with a Group Discussion Forum consisting of various disciplines and experts in their fields (Subject Matter Expert/SME). Based on the results of the SMART Decision Analysis from available alternatives and project criteria, the best alternative to be proposed as a project to the leadership (DE & DRB) is the installation of a peculator at the annulus casing of the production well in the Petko field. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Syukron, Muhammad
PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS
description WK Rokan is the most productive oil block in the history of Indonesia’s oil and gas, has more than 12 thousand active oil wells scattered in more than 100 active fields operating and contributes around 23.5% of national oil production. One of the active fields in WK Rokan is the Petko field which has around 400 production wells with a production of nearly 17,000 Barrels Oil Per Day (BOPD). Production wells with high reliability without operational disruption are the company's target to obtain optimal production. One of the crucial problems related to the reliability of production wells in the Petko field is the presence of associated gas or back pressure in the annulus casing of the production wells which causes a gas lock to occur in Electrical Submersible Pump (ESP). Production wells become shutting down and then impact losses of oil production called Loss Production Opportunity (LPO). Production wells with high associated gas or back pressure are called gassy wells. The purpose of this final project is to conduct a comprehensive analysis to mitigate the problem of gassy wells in the Petko field so that appropriate recommendations and solutions are resulted from several identified alternatives to obtain optimal and reliable production well operations and also prevent incidents that have an impact on safety of the worker and surrounding community even environmental issues in the operation area. Gassy well problems were assessed using the Kepner Tregoe Situation Assessment (KT). Then find the root of the problem using the Kepner Tregoe (KT) Problem Analysis and verified with the 5-Whys method. The eight stages of the Simple Multi Attribute Rating Technique (SMART) method were carried out to identify decision makers, alternatives and attributes and then attribute weighting to each alternative that had been developed so that a provisional decision was obtained and accompanied by a sensitivity analysis on all alternatives. The analysis and application of the Kepner Tregoe (KT) and SMART methods are carried out with a Group Discussion Forum consisting of various disciplines and experts in their fields (Subject Matter Expert/SME). Based on the results of the SMART Decision Analysis from available alternatives and project criteria, the best alternative to be proposed as a project to the leadership (DE & DRB) is the installation of a peculator at the annulus casing of the production well in the Petko field.
format Theses
author Syukron, Muhammad
author_facet Syukron, Muhammad
author_sort Syukron, Muhammad
title PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS
title_short PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS
title_full PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS
title_fullStr PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS
title_full_unstemmed PROBLEM SOLVING AND ALTERNATIVE SELECTION TO IMPROVE GASSY WELL AT PETKO FIELD BY USING DECISION ANALYSIS
title_sort problem solving and alternative selection to improve gassy well at petko field by using decision analysis
url https://digilib.itb.ac.id/gdl/view/66732
_version_ 1822933137236164608