LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM

Batu Ampar Port, Batam is one of the ports that is a container distribution channel. In 2029, this port is targeted to be able to accommodate container ships of 35.000 DWT. The ship has a draft of 11,9 meters. Meanwhile, the depth of the waters in this port is in the range of 5-12 meters. Therefore,...

Full description

Saved in:
Bibliographic Details
Main Author: Humaer Rabbani, Raudhy
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/66961
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66961
spelling id-itb.:669612022-07-27T15:07:49ZLAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM Humaer Rabbani, Raudhy Indonesia Final Project Batu Ampar Port, Dredging, Navigation Channel, Berthing Area, Turning Circle. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66961 Batu Ampar Port, Batam is one of the ports that is a container distribution channel. In 2029, this port is targeted to be able to accommodate container ships of 35.000 DWT. The ship has a draft of 11,9 meters. Meanwhile, the depth of the waters in this port is in the range of 5-12 meters. Therefore, it requires dredging the seabed to increase depth so that ships can sail and berth at Batu Ampar Port. The designed navigation channel has a width of 187 meters. The berthing area of the ship is 269 meters long and 39 meters wide. Meanwhile, the turning circle has a diameter of 429 meters. The seabed after calculation has a depth of 13,5 meters and a slope of 15° from the horizontal line. From the results of calculating the dredging volume using the cross section method, the dredging volume is 2.254.212,26 m3. The proceeds from the dredge material will be allocated to the reclamation area located in the north of Batu Ampar Port. The dredging will be carried out by 1 CSD Inai Delima ship with a work duration of 151 working days. This dredging work requires an estimated cost of Rp123.631.567.000,00 or around Rp55.000,00/m3. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Batu Ampar Port, Batam is one of the ports that is a container distribution channel. In 2029, this port is targeted to be able to accommodate container ships of 35.000 DWT. The ship has a draft of 11,9 meters. Meanwhile, the depth of the waters in this port is in the range of 5-12 meters. Therefore, it requires dredging the seabed to increase depth so that ships can sail and berth at Batu Ampar Port. The designed navigation channel has a width of 187 meters. The berthing area of the ship is 269 meters long and 39 meters wide. Meanwhile, the turning circle has a diameter of 429 meters. The seabed after calculation has a depth of 13,5 meters and a slope of 15° from the horizontal line. From the results of calculating the dredging volume using the cross section method, the dredging volume is 2.254.212,26 m3. The proceeds from the dredge material will be allocated to the reclamation area located in the north of Batu Ampar Port. The dredging will be carried out by 1 CSD Inai Delima ship with a work duration of 151 working days. This dredging work requires an estimated cost of Rp123.631.567.000,00 or around Rp55.000,00/m3.
format Final Project
author Humaer Rabbani, Raudhy
spellingShingle Humaer Rabbani, Raudhy
LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
author_facet Humaer Rabbani, Raudhy
author_sort Humaer Rabbani, Raudhy
title LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
title_short LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
title_full LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
title_fullStr LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
title_full_unstemmed LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
title_sort layout design and dredging work of navigation channel and harbour basin in the north pier of batu ampar port, batam
url https://digilib.itb.ac.id/gdl/view/66961
_version_ 1822005303049191424