LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE NORTH PIER OF BATU AMPAR PORT, BATAM
Batu Ampar Port, Batam is one of the ports that is a container distribution channel. In 2029, this port is targeted to be able to accommodate container ships of 35.000 DWT. The ship has a draft of 11,9 meters. Meanwhile, the depth of the waters in this port is in the range of 5-12 meters. Therefore,...
Saved in:
Main Author: | Humaer Rabbani, Raudhy |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66961 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN MAKASSAR NEW PORT
by: Lucio, Peter -
LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE LEWOLEBA PORT, NUSA TENGGARA TIMUR
by: Arsyad, Fiqry -
LAYOUT DESIGN AND DREDGING PROJECT OF NAVIGATION CHANNEL AND TUNING BASIN AT DRY BULK TERMINAL IN THE C PIER OF DUMAI PORT
by: E M Sirait, Maria -
DESIGN LAYOUT AND DREDGING WORK FOR THE NAVIGATION CHANNEL AND HARBOR BASIN OF PIER I AT BIRINGKASSI PORT PT. SEMEN TONASA
by: Samindara Hayasmine, Andi -
PORTS OPERATION DESIGN OF CONTAINER TERMINAL IN BATU AMPAR PORT BATAM
by: Reza Falih Ediva, Dava