#TITLE_ALTERNATIVE#
ABSTRACT: <br /> <br /> <br /> <br /> <br /> <br /> <br /> In financial level evaluation, simulation is conducted to find out five alternatives work repairment. They are (1) Track Improvement, (2) Track Improvement Plus, (3) Double Track Segmen 1, (...
Saved in:
Main Author: | Apriadi (NIM 25004001), Ronald |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/6710 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 12006039), RONALD -
#TITLE_ALTERNATIVE#
by: RONALD (NIM 15403008), KOKOH -
#TITLE_ALTERNATIVE#
by: ATASI (NIM 12007066), RONALD -
#TITLE_ALTERNATIVE#
by: AUGUSTINUS PENALOSA (NIM 13503117), RONALD -
#TITLE_ALTERNATIVE#
by: RONALD OTTOWARD SITUMORANG (NIM 13202060), TUANI