#TITLE_ALTERNATIVE#

ABSTRACT: <br /> <br /> <br /> <br /> <br /> <br /> <br /> In financial level evaluation, simulation is conducted to find out five alternatives work repairment. They are (1) Track Improvement, (2) Track Improvement Plus, (3) Double Track Segmen 1, (...

Full description

Saved in:
Bibliographic Details
Main Author: Apriadi (NIM 25004001), Ronald
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6710
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first