DECISION-MAKING PROCESS IN DEVELOPING A âQUICK WINâ PROGRAM TO INCREASE OIL PRODUCTION IN PHE SUBHOLDING UPSTREAM
Throughout 2021, PT PHE as an Subholding Upstream, faced the issue of unachieveable drilling well target with the realization of 350 wells from the target of 396 wells, or only 88.4% of the YTD RKAP Revisi target, and only 294 wells from a total of 350 wells or 84% of the Revised RKAP target that we...
Saved in:
Main Author: | Wicaksono, Aditya |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/67138 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MANAGING WORKFORCE IN PERTAMINA UPSTREAM ON INDUSTRIAL RELATION PERSPECTIVE POST GO-LIVE PERTAMINA SUBHOLDING UPSTREAM
by: Cahyadi, Dany -
INFLUENCE OF RISK TOLERANCE TO DECISION MAKING EFFECTIVENESS, A CASE STUDY FROM PERTAMINA SUB HOLDING UPSTREAM
by: Muslim, Aziz -
ECONOMIC EVALUATION OF TERMINATED UPSTREAM OIL BLOCK: A CASE OF PT âXâ
by: Musthafa Kamil, Afgan -
REDUCE UNPLANNED SHUTDOWN ON SURFACE FACILITIES OF OIL AND GAS PLANT PROCESS â IN THE CASE OF PERTAMINA UPSTREAM OIL AND GAS BUSINESS
by: Rahmat Supriyadi, Yedi -
OIL PRODUCTION CURTAILMENT SCENARIO SELECTION USING MULTICRITERIA DECISION-MAKING ANALYSIS
by: Oloan Siregar, Asatta