DECISION-MAKING PROCESS IN DEVELOPING A “QUICK WIN” PROGRAM TO INCREASE OIL PRODUCTION IN PHE SUBHOLDING UPSTREAM

Throughout 2021, PT PHE as an Subholding Upstream, faced the issue of unachieveable drilling well target with the realization of 350 wells from the target of 396 wells, or only 88.4% of the YTD RKAP Revisi target, and only 294 wells from a total of 350 wells or 84% of the Revised RKAP target that we...

Full description

Saved in:
Bibliographic Details
Main Author: Wicaksono, Aditya
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/67138
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items