DECISION MAKING TO DETERMINE STRATEGY FOR FULLFILL GOVERNMENT REQUIREMENT USING S.M.A.RT METHOD TO COMPLY THE OIL SPILL RESPOND EQUIPMENT AT PT PEP FIELDS OFFSHORE FACILITY

PT Prominence Energy Petroleum (PT. PEP) Field Pilang (hereinafter referred to as PT PEP Field) operates an oil and gas production installation in the North Sea of Java Island within Pilang WKP. The facilities managed by PT PEP include the CW Platform, DW Platform, BW Platform, AW Platform, along wi...

Full description

Saved in:
Bibliographic Details
Main Author: Dahtira Perkasa, Andre
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/83507
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia