DECISION MAKING TO DETERMINE STRATEGY FOR FULLFILL GOVERNMENT REQUIREMENT USING S.M.A.RT METHOD TO COMPLY THE OIL SPILL RESPOND EQUIPMENT AT PT PEP FIELDS OFFSHORE FACILITY
PT Prominence Energy Petroleum (PT. PEP) Field Pilang (hereinafter referred to as PT PEP Field) operates an oil and gas production installation in the North Sea of Java Island within Pilang WKP. The facilities managed by PT PEP include the CW Platform, DW Platform, BW Platform, AW Platform, along wi...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/83507 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!