INVESTMENT ANALYSIS ON DEVELOPING BINARY POWER PLANT IN GEOTHERMAL FIELD
The conversion energy of Geothermal Power plant usually lower than conventional thermal power plant (coal, gas, nuclear, etc). Geothermal power plants conversion efficiency estimation is based on the enthalpy of the produced geothermal fluid. Many of geothermal fluid consist of two phase fluid, ste...
Saved in:
Main Author: | Aji Pawitra, Bhaskara |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/67787 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
The Optimization of the small scale geothermal field for Combine or binary cycles in the power plant system
by: Perpustakaan UGM, i-lib
Published: (2001) -
THERMODYNAMIC STUDY OF BINARY CYCLE LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 13106109); Pembimbing : Dr. Ir. Ari Darmawan Pasek; Prof. Dr. Ir. T. A. Fauzi S., JOAN -
THERMODYNAMICS STUDY OF FLASH-BINARY CYCLE IN THE LAHENDONG GEOTHERMAL POWER PLANT
by: GUNAWAN (NIM : 13106008); Pembimbing 1 : Dr. Ir. Ari Darmawan Pasek; Pembimbing 2 : Prof. , CHRISTIAN -
DESIGN OF RADIAL INFLOW TURBINE FOR BINARY CYCLE IN LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 23110030); Tim Pembimbing : Prof. Dr. Ir. Aryadi Suwono; Dr. Ir. Ari D. Pasek; , JOAN -
INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
by: Sihwan Abdullah, Muhammad