PERENCANAAN DRAINASE TOL LAYANG KELAPA GADING - PULO GEBANG SEKSI KALI BGR HINGGA KALI PELEPAH RAYA
The Kelapa Gading – Pulo Gebang Elevated Toll Road’s construction as an effort to increase logistics flow around DKI Jakarta has been carried out since 2018 and was inaugurated in August 2021. The Kelapa Gading – Pulo Gebang Elevated Toll Road planned to have 9,3 km total length which will be connec...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/67809 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |