PERENCANAAN DRAINASE TOL LAYANG KELAPA GADING - PULO GEBANG SEKSI KALI BGR HINGGA KALI PELEPAH RAYA
The Kelapa Gading – Pulo Gebang Elevated Toll Road’s construction as an effort to increase logistics flow around DKI Jakarta has been carried out since 2018 and was inaugurated in August 2021. The Kelapa Gading – Pulo Gebang Elevated Toll Road planned to have 9,3 km total length which will be connec...
Saved in:
Main Author: | Fadillah, Iqbal |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/67809 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNICAL PLANNING OF DRAINAGE SYSTEM IN SECTOR A1 KELAPA GADING - PULO GEBANG FLYOVER
by: Tiara Indrajati, Intan -
IDENTIFIKASI DAN ANALISIS KUALITATIF RISIKO TERHADAP KETERLAMBATAN PROYEK DARI PENGGUNAAN GIRDER BETON PRACETAK PADA JALAN LAYANG DI INDONESIA (STUDI KASUS: PROYEK PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA JAKARTA TAHAP 1 SEKSI A KELAPA GADING â PULO GEBANG)
by: Pratama, Aditya -
KAJIAN SISTEM DRAINASE KALI BELIK YOGYAKARTA
by: , HASAN TRENGGONO, et al.
Published: (2013) -
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung
by: Fieldianto, Rhino -
OPERATOR LINIER DI RUANG HASIL KALI DALAM BERDIMENSI HINGGA
by: Ahmad Nugroho, 0813112333115
Published: (2017)