PERENCANAAN DRAINASE TOL LAYANG KELAPA GADING - PULO GEBANG SEKSI KALI BGR HINGGA KALI PELEPAH RAYA

The Kelapa Gading – Pulo Gebang Elevated Toll Road’s construction as an effort to increase logistics flow around DKI Jakarta has been carried out since 2018 and was inaugurated in August 2021. The Kelapa Gading – Pulo Gebang Elevated Toll Road planned to have 9,3 km total length which will be connec...

Full description

Saved in:
Bibliographic Details
Main Author: Fadillah, Iqbal
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/67809
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first