PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT

Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with...

Full description

Saved in:
Bibliographic Details
Main Author: Rifqi Asyraf Wardono, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/68415
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with an adequate electricity supply. sufficient with clean sources such as PLTM. The planning for this mini-hydro power plant uses the Cileunca Reservoir which is 700m long to power the power plant using a penstock. Based on calculations using the NRECA rain-runoff model, it is determined that the reliable design discharge is 30% and 80% and after routing the reservoir, the design discharge is 1.22 m3/s with a net fall height of 43.1 m. The installed capacity of the Cileunca PLTM is 472.42 kW. The construction of this PLTM costs Rp. 20,727,384,802