PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/68415 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Indonesia's population growth, especially West Java Province is at 2.57 (BPS,
2020) has a need for electricity every year, coupled with an increase in
electrification equipment in all households and transportation to reduce nonrenewable
mineral resources, making this need must be simple with an adequate
electricity supply. sufficient with clean sources such as PLTM. The planning for
this mini-hydro power plant uses the Cileunca Reservoir which is 700m long to
power the power plant using a penstock. Based on calculations using the NRECA
rain-runoff model, it is determined that the reliable design discharge is 30% and
80% and after routing the reservoir, the design discharge is 1.22 m3/s with a net fall
height of 43.1 m. The installed capacity of the Cileunca PLTM is 472.42 kW. The
construction of this PLTM costs Rp. 20,727,384,802
|
---|