PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT

Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with...

Full description

Saved in:
Bibliographic Details
Main Author: Rifqi Asyraf Wardono, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/68415
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68415
spelling id-itb.:684152022-09-15T09:01:38ZPERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT Rifqi Asyraf Wardono, Muhammad Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project PLTM, Energy, Mainstay Discharge, NRECA, 472.42 kW INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68415 Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with an adequate electricity supply. sufficient with clean sources such as PLTM. The planning for this mini-hydro power plant uses the Cileunca Reservoir which is 700m long to power the power plant using a penstock. Based on calculations using the NRECA rain-runoff model, it is determined that the reliable design discharge is 30% and 80% and after routing the reservoir, the design discharge is 1.22 m3/s with a net fall height of 43.1 m. The installed capacity of the Cileunca PLTM is 472.42 kW. The construction of this PLTM costs Rp. 20,727,384,802 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Rifqi Asyraf Wardono, Muhammad
PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
description Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with an adequate electricity supply. sufficient with clean sources such as PLTM. The planning for this mini-hydro power plant uses the Cileunca Reservoir which is 700m long to power the power plant using a penstock. Based on calculations using the NRECA rain-runoff model, it is determined that the reliable design discharge is 30% and 80% and after routing the reservoir, the design discharge is 1.22 m3/s with a net fall height of 43.1 m. The installed capacity of the Cileunca PLTM is 472.42 kW. The construction of this PLTM costs Rp. 20,727,384,802
format Final Project
author Rifqi Asyraf Wardono, Muhammad
author_facet Rifqi Asyraf Wardono, Muhammad
author_sort Rifqi Asyraf Wardono, Muhammad
title PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
title_short PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
title_full PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
title_fullStr PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
title_full_unstemmed PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
title_sort perencanaan pembangkit listrik tenaga minihidro cileunca, pengalengan, jawa barat
url https://digilib.itb.ac.id/gdl/view/68415
_version_ 1822933637499191296