PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
Indonesia's population growth, especially West Java Province is at 2.57 (BPS, 2020) has a need for electricity every year, coupled with an increase in electrification equipment in all households and transportation to reduce nonrenewable mineral resources, making this need must be simple with...
Saved in:
Main Author: | Rifqi Asyraf Wardono, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/68415 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
JARINGAN SYARAF TIRUAN SEBAGAI PENGENDALI ADAPTIF PADA MODEL PEMBANGKIT LISTRIK TENAGA UAP
by: Lanny Widyastuti Pandjaitan, M.M. -
ANALISIS TWO TANK STORAGE PADA PEMBANGKIT LISTRIK TENAGA SURYA BERBASIS THERMAL DI INDONESIA
by: Azka, Muhammad -
PEMANFAATAN RESONANSI GELOMBANG UNTUK PEMBANGKIT ENERGI LISTRIK
by: Hasan Achmad, Nur -
MULTI KRITERIA ANALISIS UNTUK PENENTUAN WILAYAH POTENSIAL PEMASANGAN PEMBANGKIT LISTRIK TENAGA SURYA(PLTS) ATAP DI KOTA BANDUNG
by: Titon Nur Ihsan, Kalingga -
PERANCANGAN SISTEM PERPIPAAN PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (STUDI KASUS: PLTP UNIT IV LAHENDONG KLUSTER 24)
by: Pradipta, Irfan