FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)

Floods are natural disaster events where there is an excessive flow of water so that it can cover the lower land area and the land is submerged. One of the areas that occurred was the Cilaki-1B Minihydro Power Plant (PLTM), located in Cisewu District, Garut Regency, West Java Province. At the PLTM C...

Full description

Saved in:
Bibliographic Details
Main Author: Marciano, Bobby
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68497
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68497
spelling id-itb.:684972022-09-16T09:10:08ZFLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM) Marciano, Bobby Indonesia Final Project Flood, Flood Retaining Wall, Minihydro Power Plant, Cilaki River, PLTM Cilaki-1B INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68497 Floods are natural disaster events where there is an excessive flow of water so that it can cover the lower land area and the land is submerged. One of the areas that occurred was the Cilaki-1B Minihydro Power Plant (PLTM), located in Cisewu District, Garut Regency, West Java Province. At the PLTM Cilaki-1B, there was a flood inundation from the powerhouse to the sewer, so the operation of the PLTM which should have been used was hampered. The occurrence of inundation is caused by the Cilaki River which produces a large river discharge and the occurrence of runoff from the Cilaki River to a height of 2.04 m from the water flood surface to the left bank of the riverbed. Therefore, a Flood Retaining Wall (DPB) was planned to overcome the flood problems that occurred at the PLTM Cilaki-1B. Hydrological analysis was carried out using the Synthesis Unit Hydrograph Method, namely SCS-CN with a 25-year return period of 759.42 m3/s. This final project is to perform hydraulic analysis to model the existing condition cross-section as well as simulation of the installation of Flood Retaining Walls (DPB). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Floods are natural disaster events where there is an excessive flow of water so that it can cover the lower land area and the land is submerged. One of the areas that occurred was the Cilaki-1B Minihydro Power Plant (PLTM), located in Cisewu District, Garut Regency, West Java Province. At the PLTM Cilaki-1B, there was a flood inundation from the powerhouse to the sewer, so the operation of the PLTM which should have been used was hampered. The occurrence of inundation is caused by the Cilaki River which produces a large river discharge and the occurrence of runoff from the Cilaki River to a height of 2.04 m from the water flood surface to the left bank of the riverbed. Therefore, a Flood Retaining Wall (DPB) was planned to overcome the flood problems that occurred at the PLTM Cilaki-1B. Hydrological analysis was carried out using the Synthesis Unit Hydrograph Method, namely SCS-CN with a 25-year return period of 759.42 m3/s. This final project is to perform hydraulic analysis to model the existing condition cross-section as well as simulation of the installation of Flood Retaining Walls (DPB).
format Final Project
author Marciano, Bobby
spellingShingle Marciano, Bobby
FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
author_facet Marciano, Bobby
author_sort Marciano, Bobby
title FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
title_short FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
title_full FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
title_fullStr FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
title_full_unstemmed FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
title_sort flood control at cilaki 1b mini hydro power plant (pltm)
url https://digilib.itb.ac.id/gdl/view/68497
_version_ 1822933664948813824