STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X

PT X is a sand mining company located in the Cimangkok area, Sukabumi. Nowadays, PT X is still experiencing difficulties in achieving its production target. With a production target of 600-700 m3, PT X can only manage to reached an average of 400-500 m3 sand production. From the results of the searc...

Full description

Saved in:
Bibliographic Details
Main Author: Audrey Phlycia A, Gracella
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68753
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68753
spelling id-itb.:687532022-09-19T09:43:46ZSTRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X Audrey Phlycia A, Gracella Indonesia Final Project stakeholder risk, risk interaction, ISM-MICMAC, risk management, business process, sand mining. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68753 PT X is a sand mining company located in the Cimangkok area, Sukabumi. Nowadays, PT X is still experiencing difficulties in achieving its production target. With a production target of 600-700 m3, PT X can only manage to reached an average of 400-500 m3 sand production. From the results of the search for the root of the problem, the failure to achieve the production target occurs because of the company's problems inherent with the risks brought by the parties involved in the business process. Therefore, this study aims to manage stakeholder risk at PT X. However, to obtain the results of a more holistic risk analysis, this study also involves risk interaction analysis with the integration of the ISM and MICMAC methods. The problem formulation is answered by analyzing the stakeholder risks identified in PT X's business processes. Stakeholder risk assessment is carried out based on the integration of risk and stakeholder attributes because the negative or positive influence brought by stakeholders can increase or reduce the significance of stakeholder risk. The results of the stakeholder risk analysis show that there are six main risks that need to be managed by the company. The six risks are S7R26 groundless rumors of local residents, S3R30 ineffective communication, S4R4 supplier price fluctuations, S3R33' human error, S3R32' workers not in accordance with procedures, and S3R16' machine repair errors. This risk comes from core business processes that related to sand mining. Strategies are developed based on these six risks but are also intended to manage risks interact with the main risks. To manage the risk of PT X's stakeholders, the results of the study propose 6 strategies, which is, S.1 adjustment of the company's organizational structure, S.2 managing relationships with local communities, S.3 documenting operational activity reports, S.4 technical skills training for workers, S.5 evaluation regarding policies related to mining operations of PT X, and S.6 management of relations with suppliers. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT X is a sand mining company located in the Cimangkok area, Sukabumi. Nowadays, PT X is still experiencing difficulties in achieving its production target. With a production target of 600-700 m3, PT X can only manage to reached an average of 400-500 m3 sand production. From the results of the search for the root of the problem, the failure to achieve the production target occurs because of the company's problems inherent with the risks brought by the parties involved in the business process. Therefore, this study aims to manage stakeholder risk at PT X. However, to obtain the results of a more holistic risk analysis, this study also involves risk interaction analysis with the integration of the ISM and MICMAC methods. The problem formulation is answered by analyzing the stakeholder risks identified in PT X's business processes. Stakeholder risk assessment is carried out based on the integration of risk and stakeholder attributes because the negative or positive influence brought by stakeholders can increase or reduce the significance of stakeholder risk. The results of the stakeholder risk analysis show that there are six main risks that need to be managed by the company. The six risks are S7R26 groundless rumors of local residents, S3R30 ineffective communication, S4R4 supplier price fluctuations, S3R33' human error, S3R32' workers not in accordance with procedures, and S3R16' machine repair errors. This risk comes from core business processes that related to sand mining. Strategies are developed based on these six risks but are also intended to manage risks interact with the main risks. To manage the risk of PT X's stakeholders, the results of the study propose 6 strategies, which is, S.1 adjustment of the company's organizational structure, S.2 managing relationships with local communities, S.3 documenting operational activity reports, S.4 technical skills training for workers, S.5 evaluation regarding policies related to mining operations of PT X, and S.6 management of relations with suppliers.
format Final Project
author Audrey Phlycia A, Gracella
spellingShingle Audrey Phlycia A, Gracella
STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X
author_facet Audrey Phlycia A, Gracella
author_sort Audrey Phlycia A, Gracella
title STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X
title_short STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X
title_full STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X
title_fullStr STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X
title_full_unstemmed STRATEGY DESIGN FOR STAKEHOLDER-RISK MANAGEMENT BASED ON BUSSINESS PROCESS AT PT X
title_sort strategy design for stakeholder-risk management based on bussiness process at pt x
url https://digilib.itb.ac.id/gdl/view/68753
_version_ 1822933741531561984