PENGAWASAN DAN EVALUASI KINERJA PROYEK EPC REVAMPING PABRIK PELEBURAN PADA PT X DENGAN METODE EARNED VALUE DAN EARNED DURATION
The Revamping Pabrik Peleburan Project is one of the EPC (Engineering, Procurement, and Construction) projects undertaken by PT X. In this project, PT X acts as an EPC contractor in collaboration with another company. In previous projects, it is not uncommon for costs to exceed plans or delays. T...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68843 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!