PENGAWASAN DAN EVALUASI KINERJA PROYEK EPC REVAMPING PABRIK PELEBURAN PADA PT X DENGAN METODE EARNED VALUE DAN EARNED DURATION

The Revamping Pabrik Peleburan Project is one of the EPC (Engineering, Procurement, and Construction) projects undertaken by PT X. In this project, PT X acts as an EPC contractor in collaboration with another company. In previous projects, it is not uncommon for costs to exceed plans or delays. T...

Full description

Saved in:
Bibliographic Details
Main Author: Rahman Hanafi, Nadhif
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68843
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first