PENGAWASAN DAN EVALUASI KINERJA PROYEK EPC REVAMPING PABRIK PELEBURAN PADA PT X DENGAN METODE EARNED VALUE DAN EARNED DURATION
The Revamping Pabrik Peleburan Project is one of the EPC (Engineering, Procurement, and Construction) projects undertaken by PT X. In this project, PT X acts as an EPC contractor in collaboration with another company. In previous projects, it is not uncommon for costs to exceed plans or delays. T...
Saved in:
Main Author: | Rahman Hanafi, Nadhif |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68843 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN DASHBOARD MONITORING DENGAN METODE EARNED VALUE MANAGEMENT DAN EARNED SCHEDULE UNTUK PROYEK PEMBANGUNAN GEDUNG PERKULIAHAN
by: FAUZANIAR, TRIANDINI -
Value-at-risk, informativeness of earnings.
by: Lim, Benjamin Wan Heng., et al.
Published: (2008) -
Peningkatan Kualitas Pembuatan Keputusan pada Pengendalian Kemajuan Pelaksanaan Proyek menggunakan Analisis Earned Value
by: , AGUNG NOEGROHO, et al.
Published: (2014) -
Earnings Breaks and Earnings Management
by: OW YONG, Kevin
Published: (2010) -
Monitoring Proyek Ducting FO Kawasan Tahap III Summarecon Bandung Menggunakan Metode Earned Value Management
by: Mualim, Puji Prabawa, et al.
Published: (2020)